South Side High School

This new high school will feature modern, multipurpose educational spaces for diverse learning, music, art, health, dance, and more. Its campus will include fields for baseball, softball, football and track, as well as tennis and basketball courts.

The building will also house a self-contained school-based health center designed to support both the students and the community-at-large. The health center will provide access to comprehensive primary care and behavioral health services to residents of Englewood and surrounding neighborhoods. In September 2016, a school-based health center was opened at Steinmetz High School, and provides access health services to residents of the Belmont-Cragin, Dunning and Montclare communities as well as Steinmetz high school students.

The new high school will not only build on the surging academic progress in the area’s elementary schools but also provide postsecondary opportunities by offering early college programs at Kennedy-King College so that students can earn college credits and access vocational programs, including a construction program with carpentry and welding instruction, free of charge while in high school.

UJAMAA / Power II Joint Venture will develop the new south side High School located on South Normal Boulevard at 69th Street. As Englewood continues its resurgence, this $85 million facility will attract area students by building on the surging academic progress in the area’s elementary schools. The school will open in the fall of 2019.


Follow this project on Twitter @PBCChi #SouthSideHighSchool

Read the press release from CPS here.

View this project’s contract details here.

Columbia Explorers Elementary School Modular (C1592)

Advertisement for Bids: Contract C1592 – Columbia Explorer Elementary School Modular

Project Description:
The Public Building Commission of Chicago (PBC) has invited all Class A, B, and C prequalified firms to bid on PBC Contract C1592, for the fabrication and installation of the Columbia Explorer Elementary School Modular located at the Columbia Explorers Elementary Academy School, 4520 S. Kedzie Avenue, Chicago, IL 60632. The Project consists of the fabrication and installation of an approximately 6,700 sf, one (1) story – six (6) classroom prototype temporary modular classroom building.   The Modular will include 6 classrooms; boys and girls toilet rooms and a unisex toilet room opening off a central hallway; and janitor closet, mechanical/pump room, electrical/IT closet and storage closet opening off of the classrooms.  Storage and janitor closets include an access hatch to the crawlspace under the modular building.  Electrical, water, and sewer services will be connected to the utilities and the security/IT/AI systems will be connected to the existing school building.  The fire alarm system will be stand alone with notification to the existing school.   The security/IT/AI systems in the existing school will be upgraded to accommodate the new modular building which will require modifications in the MDF room on the second floor of the existing building and work at exterior doors and corridors, and camera upgrades to the existing system at the separate annex building across 46th Street.  Modular units will be built off-site, delivered to the site, and installed on the site-built foundation; include electrical and water service, and through-wall heat and air conditioning units in each classroom.

Site Work includes demolition and removal of the existing play equipment, monumental sign, site features, and flagpole; modifying the existing environmental barrier to accommodate a crawlspace foundation with a concrete slab floor; storm water detention system under a new play lot with play equipment; ADA parking upgrades and accessible path to the nearest door; and landscape, fencing, and concrete finishes.  Substantial Completion of the Project is anticipated to be achieved in the Fall of 2018.

The project page containing additional information can be viewed here.

List of Prequalified Bidders:

Class A General Contractors

  • All-Bry Construction Company
  • Barton Malow Company
  • Berglund Construction Company
  • Blinderman Construction Company, Inc.
  • Burling Builders, Inc.
  • Clark Construction Group – Chicago, LLC
  • Development Solutions, Inc.
  • F.H. Paschen, S.N. Nielsen & Associates, LLC
  • Friedler Construction Company
  • The George Sollitt Construction Company
  • Henry Bros. Co.
  • James McHugh Construction Company
  • K.R. Miller Contractors, Inc.
  • Madison Construction Company
  • Old Veteran Construction, Inc.
  • Path Construction Company, Inc.
  • Power Construction Company, LLC
  • Powers & Sons Construction Company, Inc.
  • Tishman Construction Corporation of Illinois
  • Turner Construction Company
  • Tyler Lane Construction, Inc.
  • UJAMAA Construction, Inc.
  • Vanir Construction Management, Inc.
  • W.E. O’Neil Construction Company
  • Walsh Construction Company II

Class B General Contractors 

  • Aldridge Electric, Inc.
  • Brandenburg Industrial Service Company
  • Broadway Electric, Inc.
  • Frederick Quinn Corporation
  • John Burns Construction
  • The Lombard Company
  • O.A.K.K. Construction Company, Inc.
  • Poulos, Inc.
  • R. T. Milord Company
  • Reliable & Associates Construction Company

Class C General Contractors

  • CCCJV
  • Cosgrove Construction, Inc.
  • Drive Construction, Inc.
  • G.E. Riddiford Company, Inc.
  • Kee Construction, LLC
  • McDonagh Demolition, Inc.
  • O.C.A. Construction, Inc.
  • Oakley Construction Company, Inc.
  • Robe, Inc.

Additional Information:

Pre-Bid Activities:
On Thursday, January 11, 2018, at the Columbia Explorers Elementary School Annex, located at 4520 S. Kedzie Avenue, Chicago, IL, PBC will host a Pre-Bid Meeting at 10:00 a.m., a Mandatory Technical Review Meeting at 10:30a.m., and a Mandatory Site Visit at 11:00a.m. The Technical Review Meeting is mandatory for all eligible, prequalified firms interested in submitting a bid for this Project. Parking in school’s parking lot is prohibited. Street parking is available. Please enter through Main Entrance on Kedzie Avenue. All Mandatory Technical Review Meeting and Site Visit attendees must wear safety vests.

Subcontractors and suppliers are invited to attend the Pre- Bid Meeting and stay for the following activities to meet the prequalified contractors bidding on this Project. The sign-in sheets for the above-mentioned meetings will be posted to the PBC’s website.

Bid Opening: 
Sealed bids shall be received at the Public Building Commission, Richard J. Daley Center, 50 West Washington, Room 200, until 11:00 a.m. Tuesday, February 6, 2018, at which time they will be publicly opened.

Questions:
All questions regarding this contract must be submitted in writing to Patricia Montenegro, Senior Contracts Manager, Public Building Commission, 50 West Washington, Room 200, Chicago, IL 60602. Questions may be emailed to bids@pbcchicago.com or faxed to Ms. Montenegro at 312/744-3572.

Pre-Bid/Tech Review/Site Visit Materials:

Addenda:

  • Addendum No. 1 for Columbia Explorers Elementary School Modular (C1592) can be obtained by clicking on the following link: Addendum No. 1
  • Addendum No. 2 for Columbia Explorers Elementary School Modular (C1592) can be obtained by clicking on the following link: Addendum No. 2

Follow this project on Twitter @PBCChi #ColumbiaModular

For more information, view the project page.

Byrne Elementary School Annex

 

The project consists of renovations to the existing building, improvements to the school’s campus, and the construction of a two-story annex. The 35,000-square-foot annex will house 15 classrooms, elevator, library, and kitchen and dining area/multipurpose room. Inside the existing school building, the lunchroom, kitchen and library will be converted into classrooms. Site improvements include a new turf play area and landscaping.


Follow this project on Twitter @PBCChi #ByrneAnnex

View this project’s contract details here.

South Loop Elementary School

The project consists of the construction of a 120,000-square-foot, 4-story elementary school and site improvements. The school will accommodate approximately 1,200 students and will house classrooms, science and computer labs, art and music rooms, a multipurpose room, gym with stage, library, kitchen and dining area, administrative center and student services suite, and a rooftop play area. Site work includes a parking lot, play area, landscaping and right-of-way improvements.


Follow this project on Twitter @PBCChi #SouthLoopElementary

View the contract details for this project here.

Dore Elementary School

The Dore Elementary School project consists of the construction of a three-story elementary school and associated site improvements. The 113,000-square-foot school will house classrooms (standard classrooms, Pre-K/K, diverse Learners, science, music, art and computer), kitchen and dining facilities, gymnatorium, library, and an administrative center and student services suite. Site work includes a parking lot, play lot, turf play area, landscaping and right-of-way improvements.


Follow this project on Twitter @PBCChi #DoreElementary

View the contract details for this project here.

Lincoln Park High School Renovation

The project consists of renovations to the existing three-story building and the separate two-story annex. Exterior work includes masonry, window and roof repairs; interior work includes upgrades to finishes, classroom renovations and mechanical systems repairs.


Follow this project on Twitter @PBCChi #LincolnParkHSReno

View the contract details for this project here.

 

Skinner West Elementary School Annex

The project consists of the construction of a new 4-story annex featuring 19 typical classrooms, an art room, a science room, and a computer classroom. The scope of work also includes site improvements and renovations to the existing building.


Follow this project on Twitter @PBCChi #SkinnerWestAnnex

View this project’s contract details here.

View the PBC’s previous work at Skinner West here.

Sheridan Math & Science Academy Annex

The Sheridan Math & Science Academy project includes the construction of a single-story facility and improvements to the site. The annex will house a STEM classroom, restrooms, and gymnasium, as well as a new elevator which will provide access to all levels of the existing building. Site improvements include upgrades to the the existing parking lot, landscaping, and the installation of a new turf play area.


Follow this project on Twitter @PBCChi #SheridanAnnex

View this project’s contract details here.

 

Richard Edwards IB Fine & Performing Arts Dual Language School Annex & Renovation

This two-part project includes the construction of a 3-story annex and renovations to the existing school building. Renovations were required in all areas affected/damaged by roof water infiltration, and damaged masonry water infiltration includes the first and second floor classrooms, gymnasium, auditorium and ancillary spaces. The required exterior repairs include a new roof system, masonry tuckpointing and lintel repairs. There will be upgrades to the mechanical, electrical and plumbing systems as it relates to the existing roof, and facade element failures.

The 50,000-square-foot annex was completed in 2016. The annex houses a lunchroom/multipurpose room, kitchen, and 24 classrooms. Three spaces in the main building were also renovated for educational use. Two modular units were demolished or removed upon completion of the annex, and a new playground was installed.

Zapata Academy Annex

The Zapata Academy project consists of the construction of a two-story annex housing standard classrooms, a computer lab and a lunch/multipurpose room, as well as renovations to the existing building, the removal of a modular building, and the installation of a new playground and turf play field.


Follow this project on Twitter @PBCChi #ZapataAnnex

View the contract details for this project here.