Prequalified GC's

The PBC has pre-qualified firms to work in the following areas. Click on the type of work to see a list of pre-qualified firms, with address, contact information, ownership information and the date pre-qualification expires.

CATEGORIES
Type of Work Description
12th District Police Station

Pre-Qualified 4/13/10

The two story 44,000 square foot building includes a Public Lobby, on hundred person Community Room, Tactical Office, Sally Port, thirteen individual and four group holding cells, interview and processing aras, male and female locker rooms, a workout room, roll call room and Adminstrative Offices.

Brighton Park II Area Elementary School

Pre-Qualified: 9/8/2009

Three-story, 105,000 square foot, L-shaped elementary school prototype.  A fully accessible facility providing the following spaces:  Twenty-four classrooms; Six Pre-Kindergarten/Kindergarten Classrooms; Music  Classroom; Art Classroom; Science Lab; Computer Lab; 110-seat Gymnasium with elevated stage and Athletic Storage; Cafeteria/ Dining Room with Warming Kitchen; Library; Administrative Offices with Reception; Conference Room and Workroom; Student Services Suite; Nurses' Office, Examination Rooms, Laundry and Storage.

Chicago Park District Osterman Beach Playgound

Pre-qualified 1/12/2010

20,000 square foot playground, installation of pre-purchased playground equipment, general landscaping and the installation of rubberized soft surface material.

Chicago Public School Urban Model High Schools

Pre-Qualified 4/13/10

  • Southwest Area High School

  • Back of the Yards High School

Each school totaling approximately 200,000 square feet on three floors plus a lower level. Each building is intended to serve 1,200 students plus faculty. staff and administration.

ES Addition & Renovation $10 mil & Greater

Pre-Qualified 4/13/10

This is for Elementary School projects valued at $10 million and greater.

Typical projects may range from a one story to two story additions with building size between 32,500 square feet and 42,000 square feet. Projects may be fully accessible facilities with or without renovation requirements to existing buildings at connection points.

ES Addition & Renovation Under $10 mil

Pre-Qualified 4/13/10

This is for Elementary School projects valued less than $10 million.

Typical projects may range from a one story to two story additions with building size between 32,500 square feet and 42,000 square feet. Projects may be fully accessible facilities with or without renovation requirements to existing buildings at connection points.

Gateway Harbor

Pre-qualified 10/8/2009

New 240-slip marina to be constructed immediately south of Navy Pier.  marina amenities include a two-story, 200-person dockside restaurant, landfill, commercial boat piers, harbor services building, utilities, roads, at-grade parking and landscaping.

Haas Park Fieldhouse

Pre-Qualified 4/13/10

A one story 10,000 square foot, fully accessible Chicago Park District Fieldhouse that includes a main lobby, entance with vestibule, reception area, fitness room with athletic equipment, multi-purpose club rooms, a multi-purpses athletic room and a basketball court.

JOC - Facility Renovation Work
Michael Reese Hospital (Group G) Group G: Asbestos Abatement of one building.
Michael Reese Hospital (Groups A, B, C, D, E & F) Groups A, B, C, D, E and F: Demolition and Asbestos Abatement of various buildings and structures.

Print This Page