The Campus Park site improvement is a 2.6 acre site. The old playground equipment set, the existing asphalt surface and the street closure of Elizabeth Street will be demolished in order to provide an open field with green space at the site. It will consist of the following amenities:
- Landscaping with shade trees,
- Flood lighting,
- Ornamental fencing,
- Benches,
- Trash receptacles,
- Playground equipment for ages 2-5
- Playground equipment for ages 5-12, and
- 2 full basketball courts with basketball hoops.
Along with the site improvement, the existing parking lot will be resurfaced.
1241 West 58th Street
Ward 16: 67
CONTRACT INFORMATION
Architect of Record:
DLK Architecture, Inc.
Contract:
General Contractors:
Pacific Construction Services, Inc.
PROJECT DOCUMENTS