These projects consist of a CDOT Works Progress Administration (“WPA”) street reconstruction and CDOT Capital Program Alleys (Various Locations) including full-depth pavement and alley reconstruction of seventeen (17) locations.
Work includes but not limited to street reconstruction excavation, cement concrete, hot-mix asphalt surface course, sewer and water main.
Also work includes but not limited to alleys reconstruction proper handling and disposal of onsite material, concrete: cement concrete base course, garage aprons curb and gutter, sidewalks, alleys, driveways, hot-mix asphalt, surface course, sewer and drainage structures, sewer cleaning and televising, and ADA Ramps various depths, and pre-molded rubber Speed Bumps, geotechnical fabric, topsoil, and hydraulic seeding.
Click here to schedule July 30, 2025 interview between 10:00am – 3:00pm