PROJECT DESCRIPTION:
The Public Building Commission of Chicago (PBC) has invited all Contractors to bid on PBC Contract C1624, Works Progress Administration (“WPA”) Street Reconstruction (W. 89th St., S. Central Park Ave., S. Holland Rd.).
The WPA Street Reconstruction (W. 89th St., S. Central Park Ave., S. Holland Rd.) Project is located at:
- W. 89th St. – West 89th Street from South Princeton Avenue to South Holland Road Chicago
- S. Central Park Ave. – South Central Park Avenue from West 73rd Street to West 71st Street Chicago
- S. Holland Rd. – South Holland Road from West 89th Street to South Princeton Avenue Chicago
The project consists of a Works Progress Administration (“WPA”) street reconstruction Project, including: full-depth pavement reconstruction of the location indicated above. Work includes but isn’t limited to excavation, portland cement concrete base course, hot-mix asphalt surface course, sewer main, water main and drainage structures, water main, concrete curb and gutter, concrete sidewalks, tactile/detectable warning surface system for curb ramps, concrete driveways and alleys, lighting, thermoplastic pavement marking, signs, topsoil, sodding, tree removal and planting.
Contractor will be required to prepare a Phasing and Logistics Plan within thirty (30) days of issuance of the Notice to Proceed (‘NTP’) for review and approval by CDOT and PBC, prior to the mobilization and commencement of any Work. The Contractor shall also be responsible for providing critical submittals, including electrical lighting (poles and luminaires), sewer and water main, and concrete mix design, as determined by the PBC, within thirty (30) days of issuance of the NTP.
The Project includes DWM Lead Service Line Replacement Work with three (3) service lines at S. Holland Rd. DWM requires approximately two (2) days per location to perform the work. DWM’s work is anticipated to commence Q3-2025. Upon Contract Award of the new WPA Projects, a meeting will be scheduled to review and confirm any/all coordination items, including DWM’s planned work activities. ComEd will relocate one (1) utility pole Alley on S. Holland Rd. between W. 89th Street and S. Yale Ave. ComEd will provide utility pole bracing at three (3) locations during construction between S. Yale Ave. and S. Princeton Ave.
DOCUMENT AVAILABILITY:
- Book 1 Instructions to Bidders may be found here
- Master Bid Form may be found here
- Plans and specifications, including any Addenda issued for the above-referenced project may be found here: Aloha Planroom.
- The list of Assist Agencies who will have access to complete sets of digital drawings and specifications can be found here.
PRE-BID ACTIVITIES:
On Thursday, May 22, 2025, PBC will host a Non-Mandatory Virtual Pre-Bid Meeting at 11:00 a.m., and a Non-Mandatory Virtual Technical Review Meeting at 11:30 a.m. on ZOOM virtual meeting platform.
To join click on the link or call the number below:
-
- Meeting Link: WPA Street Reconstruction (W. 89th St., S. Central Park Ave., S. Holland Rd.)
- Meeting Phone Number: 312-626-6799
- Meeting ID: 832 4877 0580
- Meeting Passcode: None required
Subcontractors and suppliers are encouraged to attend.
Pre-Bid/Tech Review Materials:
- (Non-Mandatory) Works Progress Administration (“WPA”) Street Reconstruction (W. 89th St., S. Central Park Ave., S. Holland Rd.) – Pre-Bid and Tech Review Presentation (will appear here when available)
- (Non-Mandatory) Works Progress Administration (“WPA”) Street Reconstruction (W. 89th St., S. Central Park Ave., S. Holland Rd.) – Pre-Bid and Tech Review Attendance Sheet (will appear here when available)
To view related video(s), please click on respective link(s) below:
- (Non-Mandatory) Works Progress Administration (“WPA”) Street Reconstruction (W. 89th St., S. Central Park Ave., S. Holland Rd.) – Pre-Bid and Tech Review Video (will appear here when available)
Addenda:
(To be uploaded once available)
BID OPENING:
Sealed bids shall be received electronically by Dee Taylor, Contract Officer at: dee.taylor@cityofchicago.org and pbc-procurement@cityofchicago.org, by 11 a.m. on Tuesday, June 5, 2025. A Public Bid Opening, streamed on the PBC YouTube channel, will immediately follow at 11:00 a.m.
Please refer to Book 1 Instructions to Bidders, Submission of Bids, for further instructions.
Bid Tabulation:
(To be uploaded once available)
To view related video(s), please click on respective link(s) below:
(To be uploaded once available)
QUESTIONS:
All questions regarding this contract must be submitted in writing, via email to Dee Taylor, Contract Officer at: dee.taylor@cityofchicago.org no later than May 29, 2025.
Public Building Commission of Chicago
Mayor Brandon Johnson, Chairman
Ray Giderof, Executive Director
Office of Inspector General Complaint Hotline
If you see corruption, fraud, waste, or dishonest practices of any kind please report it to the City of Chicago Office of Inspector General (OIG) – PBC’s oversight body. Concerned employees, contractors, consultants, and members of the public may contact OIG via its independent hotline and website.
Telephone Reporting: (866) IG-TIPLINE (866-448-4754).
Web Reporting: http://ChicagoInspectorGeneral.org/Get-Involved