Sherman Park Branch Library – Repairs and Renovations (2FM CIP)

This Project is part of the Capital Improvement Program (CIP) Projects being developed on behalf of the City of Chicago’s Department of Fleet and Facility Management (2FM) and Chicago Public Library (CPL).  Work is anticipated to include interior renovations to an existing facility and site improvements, including but not limited to:  Exterior scope for roof repairs and replacement, façade selective tuck-pointing, exterior signage, exit stair well enclosures, ADA flatwork, and associated site improvements.  Interior scope for ADA signage, ceiling and wall repairs, restroom upgrades, new staff lounge, new exterior doors/frame/hardware, new circulation desk, new BAS system, new mechanical system, and new folding operable partition.

View the Construction Contract Procurement details here.

For Current Job Opportunities click here 

Follow this project on Twitter @PBCChi

5440 South Racine Avenue
Ward 20: New City

CONTRACT INFORMATION

Architect of Record:  Tilton, Kelly + Bell, LLC

AOR Contract:  PS3028

General Contractor (GC): Angstrom, LLC d/b/a Angstrom Design + Build

GC Contract: C1630

PROJECT DOCUMENTS

PRESS RELEASES

DWM New Operations Facility

This Project is being developed on behalf of the City of Chicago.  The Project is anticipated to provide for the development of a new Department of Water Management (DWM) operations facility, including a new building to accommodate the administrative and warehouse operations of DWM, along with site improvements.

Visit the Design-Build Procurement details here

Follow this project on Twitter @PBCChi

4825 W. Lawrence

Ward 45: Portage Park

CONTRACT INFORMATION

Design Architect: Moody Nolan, Inc.

Design Architect Contract:  PS3032

Design-Builder: KEO IL and Leopardo Construction Joint Venture

Design-Builder Contract: PS3104

Payment Applications:

PROJECT INFORMATION

PRESS RELEASES

Feasibility Study: Shoreline Restoration 71st to 75th Street

In coordination with the Chicago Department of Transportation (CDOT), the project is anticipated to include a feasibility study for assessing improvements along the Lake Michigan Shoreline between 71st to 75th Streets.

Contract Information

Architect of Record (Feasibility Study) – Milhouse Engineering and Construction

AOR Contract:  PS3038

Procurement Details

DFSS Bronzeville Regional Senior Center

This Project is being developed on behalf of the City of Chicago.  The Project is anticipated to provide for the development of a new Department Family and Support Services (DFSS) Regional Senior Center.  The Project is anticipated to include community and administrative spaces, along with site improvements, in support of the DFSS’ senior programming.

View the Design-Build Procurement details here

Follow this project on Twitter @PBCChi

4717 S. Calumet Avenue
Ward 03: Grand Boulevard

PROJECT INFORMATION

3rd Ward Senior Update and Community Meeting: Presentation

3rd Ward May 21, 2026 Townhall Meeting: Presentation

PRESS RELEASES

Chicago Public Safety Headquarters Renovations (2FM CIP)

This Project is part of the Capital Improvement Program (CIP) Projects being developed on behalf of the City of Chicago’s Department of Fleet and Facility Management (2FM).  Work is anticipated to include interior renovations and site improvements.

Follow this project on X @PBCChi

Sachs Clinic Renovations (2FM CIP)

This Project is part of the Capital Improvement Program (CIP) Projects being developed on behalf of the City of Chicago’s Department of Fleet and Facility Management (2FM).  Work is anticipated to include MEP improvements.

Follow this project on X @PBCChi

2160 W. Ogden Avenue
Ward 28: Near West Side

CONTRACT INFORMATION

Architect of Record:  Milhouse Engineering & Construction

AOR Contract:  PS3038

JOC Contractor: CCC Holdings, Inc. d/b/a CCC Design Build

JOC Contract: PS3093O

Payment Applications:

PROJECT DOCUMENTS

PRESS RELEASES

Hall Library Renovations (2FM CIP)

This Project is part of the Capital Improvement Program (CIP) Projects being developed on behalf of the City of Chicago’s Department of Fleet and Facility Management (2FM).

Follow this project on X @PBCChi

Kells (George) Park Fieldhouse

On behalf of the Chicago Park District, this Project is anticipated to include the planning, design and construction associated with a new Fieldhouse and site development at the existing Kells (George) Park.

View the Design Builder procurement details here.

Follow this Project on X @PBCChi #PBCKellsGeorgePark

726 N. Kedzie Avenue
Ward 27 – Humboldt Park

PROJECT INFORMATION

PRESS RELEASES

City Colleges of Chicago. School of Nursing

On behalf of City Colleges of Chicago, this Project is anticipated to include design and renovations to portions of the existing Library Facility at Kennedy-King College to create nursing laboratories, classrooms, and accompanying student learning and experimenting spaces. Additional work may consist of upgrades to the mechanical systems and associated work for the existing library and new functions of the nursing program.

View the Design Builder procurement details here.

Follow this Project on X @PBCChi

6301 South Halsted Street
Ward 16 – Englewood

PROJECT INFORMATION

PRESS RELEASES

Emergency Medical Services (EMS) Addition

The project, located at 701 N. Kilbourn, is anticipated to include a new addition to the existing Public Safety Training Center Facility, along with associated site development. The building program includes offices, training rooms, classrooms, simulation labs, support spaces, and new MEP/FP systems.

View the Construction Contract Procurement details here.

For Current Job Opportunities click here 

Follow this Project on @PBCChi